"Inline inspection activities were performed using a compressor at ambient temperatures between -40⁰C and +20⁰C in dry pipe (ambient air was used as service environment) diameters 720 mm, 530, 426 and 325 mm."
01.04.2015 02:58/more...
"Procedures developed by NTC Neftegazdiagnostika, the expert and technical support allowed performing works safely and to a good quality which is crucial given high criticality of works executed on offshore pipelines and extreme complexity of the project including use of pumps and compressors, ship support, underwater works and other technical specifics. "
23.03.2015 10:08/more...
"During work performance NTC NefteGazDiagnostika proved itself to be a highly professional company with qualified managers and personnel solving problems efficiently and in a quality manner"
11.09.2014 00:42/more...
"...NTC NefteGazDiagnostika has all the licenses, specialists and equipment required for work performance. Diagnostics works are performed with high quality and expertise. Following the diagnostics the required quality technical reports are issued including comprehensive information support provided."
06.06.2013 00:45/more...
"In the inline inspection work performance NTC NefteGazDiagnostika proved itself to be a reliable and responsible partner especially in those situations where pipeline operating conditions deviate from standard as well as in special problem solving."
05.06.2013 22:43/more...
|
27.03.2016 - 05.04.2016 Viktor Leshchenko, Director General “NTC “Neftegazdiagnostika” LLC, visited Calcutta (India) to participate ...
A sole agency agreement was signed between NTC NEFTEGAZDIAGNOSTIKA LLC and Abdel Hadi Abdullah Al-Qahtani & Sons Company
On September 12, the laboratory VNIPI "VZRYVGEOFIZIKA" conducted New website launched! Inline inspection of main gas line Nord Stream pipeline 1-East, Dn 1220×34.6/41 mm, 1224.4 km long Inline inspection of main gas line Nord Stream pipeline 2-East, Dn 1220х34.6/41 mm, 1224.4 km long Segment 1, gas pipeline Ø 1220 mm. OPF – BS-2, 295 km long. Segment 2, gas pipeline Ø 1220 mm. BS-2 – OET, 328 km long. Inline inspection of the offshore oil pipeline "OIFP D-6 – oil gathering facility "Romanovo", Dn 273x18, 51.812 km long. Integrated diagnostics of sub-sea oil pipeline "OIFP – SPM, oil field n.a. Yu. Korchagin" started. Installation and dismantling of temporary pig launchers/receivers Pipeline cleaning, gauging, geometry inspection, magnetic pig inspection Subsea external inspection using ROVs Cleaning of the offshore oil pipeline "OIFP – SPM, oil field n.a. Yu. Korchagin", Dn 325×16.