« Back 01.04.2015 02:58 " In 2006 and 2011 inline inspections of new constructed pipelines were performed in CJSC ROSPAN International. Works were executed by a Russian expert organization NTC Neftegazdiagnostika with the involvement of ROZEN Europe B.V. (the Netherlands) inspection tools. Inline inspection activities were performed using a compressor at ambient temperatures between -40⁰C and +20⁰C in dry pipe (ambient air was used as service environment) diameters 720 mm, 530, 426 and 325 mm. The scope of work included (for each pipeline) a gauging pig run, run of cleaning pigs of different designs, smart caliper pig run and TFI and MFL magnetic inspection tools run. Works were executed with high quality, on schedule and within the fixed contract price.
Project Director, Pipelines M. Khusnullin" |
27.03.2016 - 05.04.2016 Viktor Leshchenko, Director General “NTC “Neftegazdiagnostika” LLC, visited Calcutta (India) to participate ...
A sole agency agreement was signed between NTC NEFTEGAZDIAGNOSTIKA LLC and Abdel Hadi Abdullah Al-Qahtani & Sons Company
On September 12, the laboratory VNIPI "VZRYVGEOFIZIKA" conducted New website launched! Inline inspection of main gas line Nord Stream pipeline 1-East, Dn 1220×34.6/41 mm, 1224.4 km long Inline inspection of main gas line Nord Stream pipeline 2-East, Dn 1220х34.6/41 mm, 1224.4 km long Segment 1, gas pipeline Ø 1220 mm. OPF – BS-2, 295 km long. Segment 2, gas pipeline Ø 1220 mm. BS-2 – OET, 328 km long. Inline inspection of the offshore oil pipeline "OIFP D-6 – oil gathering facility "Romanovo", Dn 273x18, 51.812 km long. Integrated diagnostics of sub-sea oil pipeline "OIFP – SPM, oil field n.a. Yu. Korchagin" started. Installation and dismantling of temporary pig launchers/receivers Pipeline cleaning, gauging, geometry inspection, magnetic pig inspection Subsea external inspection using ROVs Cleaning of the offshore oil pipeline "OIFP – SPM, oil field n.a. Yu. Korchagin", Dn 325×16.