Studying the fiberglass structures evolution and using the analysis of existing methods to repair pipelines, specialists of «NefteGazDiagnostika» LLC have developed the composite pipeline sleeve SMART LOCK.
This product has been commercially available since 2008. The sleeve consists of two half-shells manufactured by unidirectional winding of glass roving on stainless steel flanges.
SMART LOCK products are qualified for application in the petroleum sector, they have hygienic and conformity certificates as well as ISO 9001 — 2008 conformity certificate. SMART LOCK application enables online, inexpensive, simple and reliable repair of pipelines to be performed that, according to the industrial safety expertise conclusion, is classified as the major repair.
The principle of SMART LOCK operation — the pipeline internal pressure compensation by the external contact pressure developed at high tightening torque of bolted connections.
The technology allows SMART LOCK installing at operating pressures with guaranteed quality, unlike the sleeves installed without preloading.
SMART LOCK are different from all currently existing types of repair sleeves — it covers a wide range of existing types and sizes of the pipelines under repair — from 50 to 1420 mm in outside diameter. It provides full overlap of the repaired section, their installation is simple, repair rate is high, the volume of needed earth-moving works is low. Long flaws can be repaired using sleeves sequenced back-to-back mounting.
SMART LOCK can be used also for underwater pipelines repair. Since this repair is classified as permanent, some oil- and gas producing enterprises use SMART LOCK to repair the pipelines’ ruptures, including repairs without pressure release (hot tapping).
SMART LOCK can be used to repair emergency pipeline leaking.
In most cases repair using SMART LOCK is an alternative to spool cut. Maintenance spot can be easily detected from the ground surface and with the help of in-line inspection facilities.
27.03.2016 - 05.04.2016 Viktor Leshchenko, Director General “NTC “Neftegazdiagnostika” LLC, visited Calcutta (India) to participate ...
A sole agency agreement was signed between NTC NEFTEGAZDIAGNOSTIKA LLC and Abdel Hadi Abdullah Al-Qahtani & Sons Company
On September 12, the laboratory VNIPI "VZRYVGEOFIZIKA" conducted New website launched! Inline inspection of main gas line Nord Stream pipeline 1-East, Dn 1220×34.6/41 mm, 1224.4 km long Inline inspection of main gas line Nord Stream pipeline 2-East, Dn 1220х34.6/41 mm, 1224.4 km long Segment 1, gas pipeline Ø 1220 mm. OPF – BS-2, 295 km long. Segment 2, gas pipeline Ø 1220 mm. BS-2 – OET, 328 km long. Inline inspection of the offshore oil pipeline "OIFP D-6 – oil gathering facility "Romanovo", Dn 273x18, 51.812 km long. Integrated diagnostics of sub-sea oil pipeline "OIFP – SPM, oil field n.a. Yu. Korchagin" started. Installation and dismantling of temporary pig launchers/receivers Pipeline cleaning, gauging, geometry inspection, magnetic pig inspection Subsea external inspection using ROVs Cleaning of the offshore oil pipeline "OIFP – SPM, oil field n.a. Yu. Korchagin", Dn 325×16.