« Back 11.07.2007 00:46 “In 2007 OJSC Varyeganneftegaz signed a contract with NTC Neftegazdiagnostika for inline inspection of two field oil pipelines laid in parallel, Dn325 mm, total length 70.6 km. The contract included runs of cleaning pig, gauging pig, electronic geometry pig and high resolution inspection pig manufactured by ROSEN Europe B.V. Following the work performed all defects identified in the pipeline body were confirmed by commission ADI performed. The inline inspection data analysis done by NTC Neftegazdiagnostika revealed CP-related negative interinfluence of the above two pipelines. NTC Neftegazdiagnostika proposed an action plan to modify the existing CP system. Following the diagnostics NTC Neftegazdiagnostika provided detailed findings and recommendations for future safe operation of the pipelines. NTC Neftegazdiagnostika is a competent inline inspection contractor. NTC Neftegazdiagnostika has all licenses, staff and equipment required for work execution available. Proficiency of onsite work performance and high quality reports submission are worth noting as well as NTC Neftegazdiagnostika personnel effectiveness and attentiveness. In the inline inspection work performance NTC Neftegazdiagnostika proved itself to be a reliable and responsible partner especially in those situations where pipeline operating conditions deviate from standard and also in special problem solving. P. Lisitsin Director, TD, OJSC Varyeganneftegaz” |
27.03.2016 - 05.04.2016 Viktor Leshchenko, Director General “NTC “Neftegazdiagnostika” LLC, visited Calcutta (India) to participate ...
A sole agency agreement was signed between NTC NEFTEGAZDIAGNOSTIKA LLC and Abdel Hadi Abdullah Al-Qahtani & Sons Company
On September 12, the laboratory VNIPI "VZRYVGEOFIZIKA" conducted New website launched! Inline inspection of main gas line Nord Stream pipeline 1-East, Dn 1220×34.6/41 mm, 1224.4 km long Inline inspection of main gas line Nord Stream pipeline 2-East, Dn 1220х34.6/41 mm, 1224.4 km long Segment 1, gas pipeline Ø 1220 mm. OPF – BS-2, 295 km long. Segment 2, gas pipeline Ø 1220 mm. BS-2 – OET, 328 km long. Inline inspection of the offshore oil pipeline "OIFP D-6 – oil gathering facility "Romanovo", Dn 273x18, 51.812 km long. Integrated diagnostics of sub-sea oil pipeline "OIFP – SPM, oil field n.a. Yu. Korchagin" started. Installation and dismantling of temporary pig launchers/receivers Pipeline cleaning, gauging, geometry inspection, magnetic pig inspection Subsea external inspection using ROVs Cleaning of the offshore oil pipeline "OIFP – SPM, oil field n.a. Yu. Korchagin", Dn 325×16.