« Back 04.08.2010 00:47 “Between October 12 and December 11, 2009 under Contract No AG-09-P/670 dd. October 28, 2009 OOO NTC Neftegazdiagnostika’s personnel located and confirmed by ADI 29 most critical defects identified following the inline inspection of the export condensate pipeline between UKPG-31 and UPKT previously performed by your company under Contract No AG-09-P/625 dd. July 7, 2009. The detectability rate is 100%. Most defects were identified on the pipeline segments laid in swampy areas. To repair 29 defects 41 composite reinforcing sleeves UKMT-377 manufactured by OOO PSO Neftegazdiagnostika were installed. Due to extended defects in 12 areas two sleeves per defect were required for repair. Repair works were performed immediately after ADI without condensate pipeline shutdown without pressure reduction without hot works within a single mobilization of diagnostics and repair personnel and off road and excavation equipment. ADI and repair performed simultaneously and advanced pipeline repair method applied made it possible to use material, equipment and human resources in the optimum manner and to the maximum effect which eventually allowed our company to save substantially. V. Tsuba Acting General Director” |
27.03.2016 - 05.04.2016 Viktor Leshchenko, Director General “NTC “Neftegazdiagnostika” LLC, visited Calcutta (India) to participate ...
A sole agency agreement was signed between NTC NEFTEGAZDIAGNOSTIKA LLC and Abdel Hadi Abdullah Al-Qahtani & Sons Company
On September 12, the laboratory VNIPI "VZRYVGEOFIZIKA" conducted New website launched! Inline inspection of main gas line Nord Stream pipeline 1-East, Dn 1220×34.6/41 mm, 1224.4 km long Inline inspection of main gas line Nord Stream pipeline 2-East, Dn 1220х34.6/41 mm, 1224.4 km long Segment 1, gas pipeline Ø 1220 mm. OPF – BS-2, 295 km long. Segment 2, gas pipeline Ø 1220 mm. BS-2 – OET, 328 km long. Inline inspection of the offshore oil pipeline "OIFP D-6 – oil gathering facility "Romanovo", Dn 273x18, 51.812 km long. Integrated diagnostics of sub-sea oil pipeline "OIFP – SPM, oil field n.a. Yu. Korchagin" started. Installation and dismantling of temporary pig launchers/receivers Pipeline cleaning, gauging, geometry inspection, magnetic pig inspection Subsea external inspection using ROVs Cleaning of the offshore oil pipeline "OIFP – SPM, oil field n.a. Yu. Korchagin", Dn 325×16.